Commercial

Project: Commercial Retrofit MTM Autohaus

Client: ACA Autobody

Project Budget: $2M

Date 2016-2018

Work Items: Exterior Cladding, Blueskin waterproofing, Interior Walls, Plumbing, HVAC, Electrical, Insulation, Drywall, Flooring Tiles, New Sign, Outside Parapet, Steel Stud, the construction of an office space and washrooms for showroom space.

Description:

Full interior and exterior fit out to create a new and exciting. Works included demolition of the existing interior, and exterior cladding, new internal finishes, millwork, alongside new Mechanical, Electrical and Plumbing upgrades, the outside work included installation a parapet masonry wall on the roof, Blueskin waterproofing around the parapet and exterior walls, new aluminum cladding all around, new partition walls and layout to create a new office and washroom spaces, using steel studs, thermal insulation and drywall, installation of new flooring tiles, new sign, and exterior architectural frontage features

Transforming both the inside and outside into a vibrant and innovative space: Our comprehensive project involved a complete overhaul, encompassing interior and exterior areas. We commenced by demolishing the existing interior space and exterior cladding. Following this, we introduced new internal finishes and millwork, coupled with substantial upgrades to the Mechanical, Electrical, and Plumbing systems. Our outdoor enhancements consisted of constructing a parapet masonry wall on the rooftop, applying Blueskin waterproofing to safeguard the parapet and exterior walls, and outfitting the entire building with new aluminum cladding. Inside, we reimagined the space by erecting new partition walls and reconfiguring layouts to craft contemporary office and washroom areas, utilizing steel studs, thermal insulation, and drywall. We also installed new flooring tiles, a striking new sign, and distinctive architectural frontage features to elevate the exterior appearance.